Massimiliano Zago's profile

Mose project exit from the dry dock

Last check to the main pump pipe
 and last check to the exterior structure of the floating door
 
Main tower crane at the side of the dry dock
All is ready 
The main valve is opened and the sea water flows
Meanwhile came the night
the last adjustment
the water rises
time to leave for Venice
Mose project exit from the dry dock
Published:

Mose project exit from the dry dock

The floating doors of the MOSE project were built in the Ocean's dry dock in Trieste Italy in 2014, this is the final step, when the drydock was Read More

Published: