02 New Doha International Airport - Duty Free Express

Scope of work: Manufacturing, supplying and installation to 11 Concessions of Millworks & Interior finishes & Fit-out and shop-fitting to the Custom Furniture.
• The Project is a joint vendor between, QATART DESIGN as Managing Company – SANTACROCE SPA as a material supplying company.
 Qatart Santacroce is working under Main Contractor QIAJV (QIT- IMAR - ALEC) as a sub-contractor.
• Consultant of the project is (PARSONS TRANSPORTATION GROUP), the Architect is (HOK), the designer of Shops (SMART DESIGN), while the owner is (NDIA)
Project Duration:  1 year 8 Months
(Preparation & Manufacturing): 1 year – (on-Site Works): 8 Months
Participation: 8 Months for on-site & Off-site management role
Position: Designer & Site Engineer
Location: Doha, QATAR
Duty Free Express - New Doha International Airport
*All the works were commenced under my on-site supervision.
*All the photos were captured by me.

My Job Description:
• Responsible for the Logistics and the safety of delivered materials.
• Managing the process of the delivery from the site to the available stores or to the desired installation areas.
• Responsible for the HSE plan, Agreement and policy for all of the labors, Installers and materials.
• Supervising the installation process in all of the concessions with on-site supervision, drawings and technical support, on-site weekly meetings, walks and weekly off-site meetings with company’s managers in-charge for both (QIAJV & QATART SANTACROCE)
• Daily meetings with each concession responsible persons to ensure the continuity of the current processes.
• performing all the material and work installation inspections (MIR) & (WIR), preparing all the required papers and drawings for the consultant and hold the meetings for the inspections.
• Responsible for making all paper works related to the project, that varies from full site reports regarding the current situation in (Logistics – Safety – Installation – Inspections), schedules for installation progress, Method Statement submission, HSE Plan, agreement and policy.
No. of people that I managed: 16 Logistics and housekeeping – 2 teams for installation each team is 8 installers along with skilled labors – 2 supervisors – 2 Office secretaries
Total of: 36
Area Before our Installation - Logistics & Preparation Stage
The area before our installation works
The area before our installation works
Work In Progress - Installation Stage
Applying Aluminum fstructure for the millwork
Applying Aluminum fstructure for the millwork
Applying Aluminum fstructure for the millwork
Adding the Stainless steel holders and shelves to the millwork
Adding the Stainless steel holders and shelves to the millwork
Another Millwork, Adding Wooden column with inner MDF 
Another Millwork, Adding Wooden column with inner MDF 
Adding Glass Shelves, lightpads and acrylic sheets
Wood paneling to the walls
Floor to ceiling millwork, aluminum structure
Floor to ceiling millwork, aluminum structure covered with MDF
Adding the required wood designer panels
Adding Shleves
Panoramic view to the work place
Panoramic view to the work place
Panoramic view to the work place
Panoramic view to the work place
Final Installation - Last Stage
Qatar Duty Free Express
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
Final Installation
02 New Doha International Airport - Duty Free Express